wtop Wrote:
-------------------------------------------------------
>
https://wtop.com/tracking-metro-24-7/2018/04/silve
> r-line-concrete-mixed-improperly-needs-special-coa
> ting/
>
> CHANTILLY, Va. (AP) — Concrete panels installed
> in the $2.6 billion project extending the D.C.
> region’s Metrorail Silver Line to Dulles
> International Airport are not as durable as they
> should be.
>
> Thousands of areas along the extension will need
> to be dealt with. And some of the concrete will
> need to be completely thrown out, despite being
> already installed.
Can't we just give metro more money to fix this?