HomeFairfax General ForumArrest/Ticket SearchWiki newPictures/VideosChatArticlesLinksAbout
Fairfax County General :  Fairfax Underground fairfax underground logo
Welcome to Fairfax Underground, a project site designed to improve communication among residents of Fairfax County, VA. Feel free to post anything Northern Virginia residents would find interesting.
Construction at Kamp Washington Intersection Starts on Jan. 11
Posted by: Ludwig ()
Date: December 29, 2015 11:22PM

http://patch.com/virginia/fairfaxcity/construction-kamp-washington-intersection-starts-jan-11


http://www.kampwashingtonimprovements.com/

Construction at Kamp Washington Intersection Starts on Jan. 11
The public is invited to an information meeting on the Kamp Washington Intersection project on Jan. 6, 2016.

Fairfax City, VA

FAIRFAX CITY, VA: The Kamp Washington Intersection (Routes 236/Main Street, Route 29/Lee Highway and Route 50/Fairfax Boulevard) construction improvements in the City of Fairfax are scheduled to begin on January 11, 2016.

The public is invited to an information meeting on the project on Jan. 6 at 1 p.m. at the City Hall Annex, located at 10455 Armstrong Street, Fairfax.

Conducted mainly at night and scheduled to continue through Spring 2017, the Kamp Washington Intersection is being improved to increase capacity for vehicular and pedestrian traffic, including:

-Improved horizontal alignment along Fairfax Boulevard/Main Street through the main intersection

-Lengthened turn lanes, and extended through lanes on Main Street from Chestnut Street to Hallman Street

-Installation of new traffic signals at Kamp Washington Intersection, Chestnut Street, Maple Street and CVS Driveway

-Improved pedestrian mobility with new crosswalks, curb ramps, sidewalks, and pedestrian signalization

Additional third lane on Lee Highway from Kamp Washington to Shell Station
Estimated cost is $11.5 million, the projects will be funded with federal, state and regional funds. The City of Fairfax is contributing $50,000.

For more information, visit: kampwashingtonimprovements.com.

Options: ReplyQuote
Re: Construction at Kamp Washington Intersection Starts on Jan. 11
Posted by: Greybeard ()
Date: December 30, 2015 12:16AM

O joy. Remind me to avoid Fairfax for the next 18 months!

Good to see the website, though. Wish that kind of outreach was more common. Of course I'm assuming it'll be updated in a timely fashion--we'll see...

Options: ReplyQuote


Your Name: 
Your Email (Optional): 
Subject: 
Attach a file
  • No file can be larger than 75 MB
  • All files together cannot be larger than 300 MB
  • 30 more file(s) can be attached to this message
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 ********   **     **  **     **        **  **     ** 
 **     **  **     **  ***   ***        **  **     ** 
 **     **  **     **  **** ****        **  **     ** 
 **     **  *********  ** *** **        **  ********* 
 **     **  **     **  **     **  **    **  **     ** 
 **     **  **     **  **     **  **    **  **     ** 
 ********   **     **  **     **   ******   **     ** 
This forum powered by Phorum.