From the NTSB's report:
"On November 13, 2008, the NTSB released the findings of its investigation. The primary cause was the under-sized gusset plates, at 0.5 inches (13 mm) thick. Contributing to that design or construction error was the fact that 2 inches (51 mm) of concrete were added to the road surface over the years, increasing the dead load by 20%. Also contributing was the extraordinary
Forum:
Off-Topic