Pedestrian Bridge Collapse Over SW 8th Street, Miami, Florida
Investigation Details
What Happened
?On Thursday, March 15, 2018, about 1:46 p.m., a partially constructed pedestrian bridge crossing an eight-lane roadway in the city of Miami, in Miami-Dade County, ...
THERE ARE TOO MANY REPORTS. NONE MENTION that chinese contractors were involved and who CHANGED THE DESIGN after filing it, and that the "planned structural members" they NTSB is ruling on WEREN'T IN THE STRUCTURE
most prominently, the "walkway" was to have a suspension system, but at installation time had NO SUSPENSION SYSTEM, AND NO WAY POSSIBLE TO AD ONE POST-CONSTRUCTION
similarly, the NTSB report contains prolific comments about rebar placement which "really are beside the point" when the whole member could never have supported the weight
IT WAS DESIGNED TO FAIL