Guinea road construction
Posted by: Katy ()
Date: July 24, 2012 06:33PM

What are they doing to guinea rd between Braddock and little river turnpike? And why is it taking so long to complete?

Options: ReplyQuote
Re: Guinea road construction
Posted by: Gordon Blvd ()
Date: July 24, 2012 06:52PM

they are rebuilding the bridge as well as it's approaches to the creek - not as easy as simply turning on the lightswitch, hun so it's gonna take a wee bit o'time............

Options: ReplyQuote
Re: Guinea road construction
Posted by: whatUsaid ()
Date: July 24, 2012 06:55PM

Gordon Blvd Wrote:
-------------------------------------------------------
> they are rebuilding the bridge as well as it's
> approaches to the creek

"They are rebuilding the bridge as well as it is approaches to the creek"

Options: ReplyQuote
Re: Guinea road construction
Posted by: Gordon Blvd ()
Date: July 24, 2012 07:09PM

rly?
Attachments:
grammar-nazi.jpg

Options: ReplyQuote
Re: Guinea road construction
Posted by: Old VDOT Guy ()
Date: July 25, 2012 01:51AM

This is one of those projects where the bridge is being completely replaced, and raised, and the utility and creek conduits also upgraded. The end result will be a bridge capable of three lanes of traffic in each direction. Don't worry though; the planning for an interchange at Guinea/Braddock Roads and expansion of Guinea Road from Braddock to Braeburn are not even funded yet, so that is many years away.

One reason the project is taking a long time is that total closures of Guinea Road are restricted to nights and weekends, and must be announced well in advance.

If you subscribe to Supervisor John Cook's newsletter, you will receive periodic updates on the project and when closures are scheduled.

Options: ReplyQuote
Re: Guinea road construction
Posted by: MBF ()
Date: July 25, 2012 09:38AM

This project was supposed to be done late last month. The contractor is terrible.

EDIT: However, if the aforementioned Supervisor Cook had his way, we would be paying more in real estate and other taxes so the county would be responsible for this bridge's replacement and other road maintenance.



Edited 1 time(s). Last edit at 07/25/2012 09:40AM by MBF.

Options: ReplyQuote
Re: Guinea road construction
Posted by: Katy ()
Date: July 25, 2012 03:53PM

MBF Wrote:
-------------------------------------------------------
> This project was supposed to be done late last
> month. The contractor is terrible.
>
> EDIT: However, if the aforementioned Supervisor
> Cook had his way, we would be paying more in real
> estate and other taxes so the county would be
> responsible for this bridge's replacement and
> other road maintenance.


Thank you VDOT guy for the information. So sad that MBF is angry at both the contractor and the supervisor.

Options: ReplyQuote
Re: Guinea road construction
Posted by: MBF ()
Date: July 25, 2012 04:14PM

Katy Wrote:
-------------------------------------------------------
> MBF Wrote:
> --------------------------------------------------
> -----
> > This project was supposed to be done late last
> > month. The contractor is terrible.
> >
> > EDIT: However, if the aforementioned Supervisor
> > Cook had his way, we would be paying more in
> real
> > estate and other taxes so the county would be
> > responsible for this bridge's replacement and
> > other road maintenance.
>
>
> Thank you VDOT guy for the information. So sad
> that MBF is angry at both the contractor and the
> supervisor.
I will readily admit I don't care for the contractor nor Cook.



Edited 1 time(s). Last edit at 07/25/2012 04:56PM by MBF.

Options: ReplyQuote
Re: Guinea road construction
Posted by: res ()
Date: July 25, 2012 05:19PM

This project is majorly being milked by the contractor. Not sure if its fixed price or time and materials, but damn, what is it going on 1 year now???? Progress moves at a slow crawl.

Options: ReplyQuote


Your Name: 
Your Email (Optional): 
Subject: 
Attach a file
  • No file can be larger than 75 MB
  • All files together cannot be larger than 300 MB
  • 30 more file(s) can be attached to this message
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 **     **  **     **  **     **  **     **  **     ** 
 **     **   **   **   ***   ***  **     **   **   **  
 **     **    ** **    **** ****  **     **    ** **   
 *********     ***     ** *** **  **     **     ***    
 **     **    ** **    **     **  **     **    ** **   
 **     **   **   **   **     **  **     **   **   **  
 **     **  **     **  **     **   *******   **     ** 
This forum powered by Phorum.