Date: April 01, 2015 10:48AM

I saw VDOT put up signs indicating the Walney Road will be closing at the bridge on April 13. Going to push a lot of extra traffic onto 28 (and 50).

http://www.virginiadot.org/projects/northernvirginia/walney_road_over_flatlick_branch.asp
Attachments:
walneyroad.jpg

Options: ReplyQuote
Re: Walney Bridge Closure
Posted by: stuckonrt28 ()
Date: June 10, 2015 01:49PM

Some photos of the Walney Road Widening and Bridge Replacement from last week...

http://www.virginiadot.org/projects/northernvirginia/walney_road_over_flatlick_branch.asp
Attachments:
Walney Road Widening and Bridge Replacement 1.jpg
Walney Road Widening and Bridge Replacement 2.jpg
Walney Road Widening and Bridge Replacement 3.jpg

Options: ReplyQuote
Re: Walney Bridge Closure
Posted by: chantillydriver ()
Date: July 30, 2015 12:34PM

Is this project on schedule? Will it re-open as promised on September 1? That is only 4 weeks away.

Options: ReplyQuote
Re: Walney Bridge Closure
Posted by: duDP3 ()
Date: July 30, 2015 12:48PM

The project web site says December 2015 completion.

http://www.virginiadot.org/projects/northernvirginia/walney_road_over_flatlick_branch.asp

Like most VDOT projects, 90% of the work will be done in the last 10% of the scheduled time and then they'll pat themselves on the back for doing such a great job.

Options: ReplyQuote
Re: Walney Bridge Closure
Posted by: Gold plated maybe? ()
Date: July 30, 2015 01:15PM

I'm interested in seeing what a 20 foot $14.8 million bridge looks like. Gold plated maybe?

Options: ReplyQuote
Re: Walney Bridge Closure
Posted by: chantillydriver ()
Date: July 30, 2015 02:34PM

Walney Road is closed from Westfields Blvd. to Mariah Court for relocation of existing sanitary sewer line and for bridge construction and will be open to one lane of vehicular traffic in each direction on September 1, 2015.

Options: ReplyQuote
Re: Walney Bridge Closure
Posted by: Nhwmb ()
Date: July 30, 2015 02:40PM

From pics above; there's still at least 3 months of site prep left. Rebar is up on one footing; probably 2 weeks to put up forming and another month plus for cure to design specs. Opposite footing at least piles have been driven. Probably using pre stressed so that is being poured now and shipped to site once footings have cured. Either way, they're on a time crunch cause come spring they're not allowed to obstruct that stream.

Options: ReplyQuote
Re: Walney Bridge Closure
Posted by: Car Block ()
Date: July 30, 2015 04:38PM

Nhwmb Wrote:
-------------------------------------------------------
> From pics above; there's still at least 3 months
> of site prep left. Rebar is up on one footing;
> probably 2 weeks to put up forming and another
> month plus for cure to design specs. Opposite
> footing at least piles have been driven. Probably
> using pre stressed so that is being poured now and
> shipped to site once footings have cured. Either
> way, they're on a time crunch cause come spring
> they're not allowed to obstruct that stream.

I'm not worried about them obstructing the stream. I worried about them obstructing my CAR!

Options: ReplyQuote
Re: Walney Bridge Closure
Posted by: m20120 ()
Date: July 30, 2015 05:26PM

Check out a drone view of the progress:

https://www.youtube.com/watch?v=jfDYqCjjBsA

Options: ReplyQuote
Re: Walney Bridge Closure
Posted by: LtWPU ()
Date: July 30, 2015 07:50PM

Car Block Wrote:
-------------------------------------------------------
> Nhwmb Wrote:
> --------------------------------------------------
> -----
> > From pics above; there's still at least 3
> months
> > of site prep left. Rebar is up on one footing;
> > probably 2 weeks to put up forming and another
> > month plus for cure to design specs. Opposite
> > footing at least piles have been driven.
> Probably
> > using pre stressed so that is being poured now
> and
> > shipped to site once footings have cured.
> Either
> > way, they're on a time crunch cause come spring
> > they're not allowed to obstruct that stream.
>
> I'm not worried about them obstructing the stream.
> I worried about them obstructing my CAR!


If da span aint up by spring then they gotta wait till summer to span it... duhh

Options: ReplyQuote
Re: Walney Bridge Closure
Posted by: Not that bad ()
Date: July 30, 2015 08:40PM

Looks like from the 7/25 drone video it is spanned.

Options: ReplyQuote


Your Name: 
Your Email (Optional): 
Subject: 
Attach a file
  • No file can be larger than 75 MB
  • All files together cannot be larger than 300 MB
  • 30 more file(s) can be attached to this message
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 **    **  **      **  **         ********   *******  
 ***   **  **  **  **  **    **      **     **     ** 
 ****  **  **  **  **  **    **      **     **        
 ** ** **  **  **  **  **    **      **     ********  
 **  ****  **  **  **  *********     **     **     ** 
 **   ***  **  **  **        **      **     **     ** 
 **    **   ***  ***         **      **      *******  
This forum powered by Phorum.