Route 50 3-Year Project Nearing Completion
Posted by: Sprawl and Crawl ()
Date: July 23, 2014 06:56AM

Route 50 3-Year Project Nearing Completion

The Route 50 Mega Project that has been underway since Nov. 2011 is expected to open three eastbound lanes by fall 2014.
http://chantilly.patch.com/groups/around-town/p/route-50-3year-project-nearing-completion

The Route 50 Mega Project that has plagued drivers in Fairfax and Loudoun counties for nearly three years is nearing completion.

The project includes three new westbound lanes between Route 28 and Poland Road in South Riding (roughly 3.7 miles), which should be completed by November 2015. The three eastbound lanes should be open to traffic by the start of school in fall 2014, WTOP reports.

Reconstruction and widening of Route 50 from four lanes to six


Relocated utility lines


Widened and upgraded bridges


Paved 10-inch multi-use paths in both directions


Equipped crosswalks with pedestrian signals


Leveled roadway with more space between travel lanes


New layers of pavement to prevent potholes


The project also includes synchronized traffic signals at Avion Parkway, Lee Road, Pleasant Valley Roads, Poland Road, Stonecraft Boulevard, and Tall Cedars Parkway.

The $94.9 million project aims to relieve current and anticipated congestion caused by increased development in Loudoun County in recent years, according to the Virginia Department of Transportation. The project costs include $10 million for preliminary engineering, $19 million for right of way acquisition, $10.5 million for utility relocation, and $55.4 million for construction.
Route 50 carries approximately 62,000 vehicles per day.
Attachments:
62e2bb3345653cb9ee6bb5759c5657f3.png

Options: ReplyQuote
Re: Route 50 3-Year Project Nearing Completion
Posted by: Sprawl and Crawl. ()
Date: July 23, 2014 08:12AM

"Paved 10-inch multi-use paths in both directions" ??

Why so wide? They could've saved millions by narrowing the multi-use paths down to 5 inches!

Options: ReplyQuote


Your Name: 
Your Email (Optional): 
Subject: 
Attach a file
  • No file can be larger than 75 MB
  • All files together cannot be larger than 300 MB
  • 30 more file(s) can be attached to this message
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 ********  **      **  **    **  **     **        ** 
    **     **  **  **   **  **   **     **        ** 
    **     **  **  **    ****    **     **        ** 
    **     **  **  **     **     *********        ** 
    **     **  **  **     **     **     **  **    ** 
    **     **  **  **     **     **     **  **    ** 
    **      ***  ***      **     **     **   ******  
This forum powered by Phorum.